Published rates, fixed fees, and a plain explanation of what moves a price up or down. No "contact us for a quote" runaround.
Get your fixed feeEvery job is quoted as one fixed fee before work starts. That fee does not change unless you change the scope — no hourly creep, no variations to the variation.
| Service | Scope | Fee (ex GST) |
|---|---|---|
| Trade breakdown | New builds and renovations to about $1.5m. Quantities grouped by trade in construction sequence — the format builders actually price from. | $900 – $1,500 |
| Full Bill of Quantities | Residential and light commercial to about $5m. Measured to the Australian standard method, ready for tender or contract. | $1,800 – $3,500 |
| Pre-tender package | Priced estimate plus construction methodology and an indicative program — the full picture for a serious tender. | $3,000 – $6,000 |
| Variations & cost-to-complete | Ad-hoc reviews, variation assessments and cost-to-complete checks for existing clients. | $150/hr or fixed |
All fees exclude GST. Invoiced on delivery, payable within 7 days.
Two projects of the same construction value can differ by a thousand dollars in measurement effort. These are the things that actually drive it:
You get a written fixed-fee quote with a scope statement and a delivery date. Accept it by email and work begins. The invoice issues on delivery with 7-day terms. For a first job with a new client, that is the whole arrangement — no deposit, no retainer, no lock-in.
A full BOQ for residential or light commercial work runs from $1,800 ex GST. A trade breakdown starts at $900 ex GST. Every job is quoted as a fixed fee before any work begins, so the number you accept is the number you pay.
A full-time estimator in Australia costs well over $120,000 a year once on-costs are included, before software. Structmate is engaged job by job, so you carry the cost only on tenders you actually price.
Standard turnaround is five business days from the point you accept the fee. Drawings that arrive Monday are typically back with you by Friday. If your tender closes sooner, say so when you enquire — shorter turnarounds are sometimes possible and are quoted separately.
Excel and PDF. The Excel version is structured so you can drop your own rates in, send trade sections to subcontractors, and roll totals up without rebuilding anything.
Send your drawings and you'll have a fixed fee and a delivery date within one business day. There's no obligation and no follow-up sequence if you decide against it.
Request a fixed quote